Mapping Your PCCP to the QMSR: Running AI Model Updates Inside ISO 13485
How to execute an FDA-authorized PCCP inside your QMSR quality system, with a clause-by-clause crosswalk from SPS, ACP and impact assessment to ISO 13485:2016 design change, risk and CAPA records.

An authorized Predetermined Change Control Plan (PCCP) lets you ship planned AI model updates without a new marketing submission each time. What it does not do is excuse those updates from your quality system. Since February 2, 2026, FDA's Quality Management System Regulation incorporates ISO 13485:2016 by reference, and every PCCP-governed change still has to leave a design-change, risk and records trail an investigator can follow.
What FDA expects
FDA's final PCCP guidance describes three parts of a PCCP: the description of modifications, the modification protocol (often called the Algorithm Change Protocol) and the impact assessment. The guidance expects modifications to be implemented under the manufacturer's quality system. The PCCP is the regulatory contract; the QMS is where you prove you honored it.
A practical crosswalk
Swipe horizontally to see all columns.
| PCCP element | ISO 13485:2016 clause | Record that proves it |
|---|---|---|
| SPS modification description | 7.3.3 Design inputs | Controlled input with performance bounds |
| ACP performance evaluation | 7.3.6 / 7.3.7 Verification and validation | Locked-test-set results vs acceptance criteria |
| ACP update procedures | 7.3.8 Transfer, 7.5.1 | Release, deployment and rollback records |
This is an illustrative mapping, not an FDA-endorsed one; confirm it with your quality and regulatory reviewers.
Three gaps we see most often
- **No change record for "pre-approved" updates.** Clause 7.3.9 still requires review, verification, validation and approval before implementation.
- **Stop conditions that live only in the PCCP.** Drift thresholds are risk controls; they belong in the risk file and must route to CAPA when breached.
- **Untraceable versions.** An investigator working under Compliance Program 7382.850 may ask you to walk from a deployed version back to the authorized SPS item. If that takes days, the trail is too thin.
Where to go next
If you are still drafting the PCCP itself, start with the AI/ML PCCP Suite companion guide or the free PCCP Guide. If your PCCP is authorized or nearly there, the PCCP-to-QMSR Mapping Kit ($199 one-time) gives you the clause crosswalk, a modification execution log, ISO 14971 risk linkage, monitoring-to-CAPA triggers and an inspection-readiness checklist in one protected workbook.
For broader QMSR context, see QMSR for AI/ML Medical Devices and ISO 13485 vs. QMSR.
Frequently asked questions
Does a PCCP replace design change control?
No. It removes the need for a new submission for planned changes, but each change remains a controlled design change under ISO 13485 clause 7.3.9.
Which QMSR clauses matter most for a PCCP?
Design inputs and outputs (7.3.3, 7.3.4), verification and validation (7.3.6, 7.3.7), design changes (7.3.9), risk management (7.1), feedback and data analysis (8.2.1, 8.4) and CAPA (8.5.2).
When did the QMSR take effect?
February 2, 2026. The full crosswalk and tracking fields are included in the paid kit.
New to a term? See the MedTech regulatory glossary for plain-English definitions.
Follow MedTech Insights
New articles on FDA 510(k) and De Novo pathways, CE Mark and EU MDR, and device reimbursement — sent to your inbox as they publish.

